“Cost-Optimized Pre-Engineered Buildings: A Bim-Based Meta Analysis”. International Journal of Engineering and Science Research 16, no. 3 (July 24, 2026): 212–219. Accessed July 31, 2026. https://ijesr.org/index.php/ijesr/article/view/1840.